Access Scaffold for AC Installation, Fleming Way, Crawley - Cost £500

We installed an urgent scaffold at Vent-Axia, Fleming Way, Crawley, RH10, to provide safe access for installing air-conditioning units on the two-storey commercial property.

The scaffold consisted of a 2.4-metre tower approximately 6 metres high, with three lifts and an upper working platform five boards deep. Its compact footprint allowed the required section of the building to be reached without installing scaffolding across a complete elevation.

The scaffold was supplied for four weeks at a total cost of £500.

Access for the Air-Conditioning Installation

This project provided the contractors with a suitable working position to install AC equipment at the upper level of the building.

The work was concentrated in one particular area, so there was no requirement to scaffold the entire side of the property. Instead, the tower was positioned where the contractors needed to work, providing access from ground level to the installation point.

At the top, the working platform was constructed five boards deep. This provided a practical area from which the contractors could carry out the installation while keeping the overall scaffold confined to the part of the building involved in the work.

For jobs such as this, the scaffold can be planned around the actual access requirement rather than automatically extending along areas of the property where no work is taking place.

Tubes Used to Build the Scaffold

A combination of scaffold tube lengths was used to form the standards, ledgers, transoms, bracing and handrails.

The main structure incorporated four 16ft tubes, together with four 10ft tubes joined on top to form the standards. Approximately ten 8ft tubes were used for the ledgers, ledger bracing and handrails.

A further fifteen 5ft tubes were used for the transoms, ledger bracing on the middle lift and the stop-end handrails.

Using different tube lengths allowed the tower to fit the available space while providing the framework needed to reach the upper part of the property. The sway and diagonal bracing visible in the photographs formed part of this arrangement, running through and around the structure at the different levels.

Working Within the Available Space

The tower’s position created a fairly confined working area.

As shown in the photographs, the scaffold sits between sections of the building, immediately alongside the lower roof and entrance area. The upper platform had to reach above this lower section of the property to provide access to the required working position.

This tube-and-fitting arrangement allowed the scaffold to be formed within this space, with the standards rising from ground level and the bracing ensuring the structure remained stable throughout the work.

The tower was installed at active commercial premises where staff and visitors still needed to move around the building. For occupied business sites, our experienced scaffolding erectors provide professional commercial scaffold solutions with boarded platforms while considering entrances, pedestrian routes and other areas that need to remain accessible while the scaffold is in place.

Protection at Ground Level

The lower part of the scaffold required additional consideration because of its location.

Vent-Axia’s Fleming Way premises is its main headquarters and manufacturing location, and the scaffold stood in an area used by people accessing and moving around the property.

Protective foam was fitted to the exposed tubes at ground level, including the standards and diagonal tubes that people could potentially come into contact with. The yellow foam is clearly visible around the lower section of the scaffold in the photographs.

This protection was particularly relevant to the installation’s position, where the base of the tower was much more accessible than it would have been on a closed or isolated site.

Controlled Ladder Access

A ladder provided safe access to the upper working level on the left-hand side of the scaffold.

Because the tower was located at an active commercial property, a ladder lock was included to restrict access when the contractors were not using the scaffold. A ladder gate was also incorporated at the access point.

The installation also included a scaffold tag.

These features were part of the setup required for this location and ensured the access arrangements accounted for the scaffold being within an occupied commercial site.

Urgent Installation in Crawley

The scaffold was required urgently so that the air-conditioning work could proceed without unnecessary delay. Our scaffolders regularly provide professional scaffold erection services in Crawley, giving contractors the working platforms they need.

Once installed, the contractors had a dedicated access tower leading to the area where the new equipment was being fitted. The scaffold provided the required working level while accounting for the entrance, lower roof and restricted space around this part of the commercial premises.

With a four-week hire period, the scaffold could remain in position while the installation work was completed without the need for a longer-term hire arrangement.

The total cost of the scaffold, including the initial installation and four weeks’ hire, was £500.

Project Details

  • Location: Vent-Axia, Fleming Way, Crawley, RH10
  • Project: Access scaffold for AC unit installation
  • Tower size: Approximately 2.4m wide
  • Height: Approximately 6m
  • Scaffold tag: Included
  • Hire period: 4 weeks
  • Total cost: £500