Tailored to your property.
Scaffold hire periods to suit your project.
London, Surrey, Sussex, Hampshire, Berkshire & Kent.
Provided where required.
Temporary staircases provide a practical way for workers to move between different levels of a construction or refurbishment project. Mays Scaffolding supplies and installs HAKI staircase systems across London and the South East, creating designated access routes for site personnel. See examples of our previous staircase installations below, including project specifications and costs. Call 020 3951 6014 to obtain a free quotation for your site.
Explore examples of our HAKI staircase systems used on construction and refurbishment projects. Each project highlights the temporary stair access provided, including the tower configuration, working heights and installation requirements, with costs included where available.
On larger construction projects, workers may need to move between several working levels throughout the day. A temporary staircase provides a defined route between those levels without requiring personnel to climb a series of scaffold ladders.
HAKI stair towers use a modular system of prefabricated components, allowing stair flights, intermediate landings and access points to be incorporated into the structure.
The system is particularly useful where several trades work at different heights or where the construction programme requires regular movement between floors.
HAKI staircases can be installed alongside a scaffold or as a separate access tower, depending on the site layout and the support required.
We establish the staircase position, access levels, and structural requirements before installation, ensuring the proposed system suits the work being carried out.
Unlike conventional staircases assembled primarily from individual scaffold tubes and fittings, HAKI stair towers use purpose-made components that connect to form a modular access structure.
The system incorporates standards, beams, braces, stair flights, landings and handrails. Prefabricated components allow the staircase to be assembled in a consistent sequence, with connections designed specifically for the HAKI system.
HAKI stair towers can be configured with clockwise or anticlockwise ascents and different stair-flight layouts. The position of entrances, exits and intermediate landings can also be adapted to the required access levels.
The main features include:
The exact staircase configuration depends on the selected system, the required height, and the site’s structural and access requirements.
HAKI staircase systems suit construction and maintenance projects where workers need regular access between different heights.
On multi-storey building projects, our scaffold structures for construction sites can incorporate temporary stair towers alongside the scaffolding, providing access between completed floors and active working levels when permanent staircases are unavailable or incomplete.
The HAKI staircase can be positioned alongside the building and connected to the relevant floors through suitable access points.
This provides a defined route for site personnel moving between levels during structural work, internal construction and subsequent trades.
Office buildings, retail premises, and other commercial properties may require temporary stair access while refurbishment work affects existing circulation routes.
A HAKI staircase can provide access to designated work areas, subject to available space, site restrictions, and the suitability of the proposed route.
Where temporary stairs are required for public use, we select a staircase system specifically designed for public access, rather than using a standard construction stair tower that may not meet the necessary requirements.
Large roof replacement projects may involve several working platforms beneath a temporary roof covering, with the supporting scaffold providing access for contractors working at different heights. A HAKI staircase can connect these levels, allowing personnel to move between the ground and the working lifts.
Where a HAKI staircase is connected to a temporary roof scaffold, both structures and their connections must be assessed together to determine the required support and access layout.
Extensive scaffold structures around commercial buildings, residential developments and industrial premises may have multiple working lifts.
Where workers need to reach these platforms regularly, a HAKI stair tower can provide a dedicated access route.
The staircase can be incorporated into the scaffold layout, with suitable connections between the tower landings and the working platforms.
HAKI stair towers and conventional tube-and-fitting scaffold staircases both provide temporary access between scaffold levels, but they differ in how they’re built.
HAKI systems use prefabricated components designed to form a modular stair tower. This allows for a more standardised assembly process, with consistent stair flights and landings across successive levels.
Traditional scaffold staircases may be constructed using tube-and-fitting scaffolding with suitable stair units, platforms and handrails. These can be useful when space is limited, or the surrounding structure requires a different approach.
The best option depends on the staircase height, available footprint, frequency of use and how the access route connects to the scaffolding.
The position of a temporary staircase affects how workers enter the structure, reach the required levels and move around the site.
Before installation, we assess the available ground area, the proposed access route and the locations where workers need to enter or leave the tower.
The staircase footprint must accommodate the selected system, including the stair flights, landings and supporting structure.
Ground conditions and supporting surfaces must also be suitable for the staircase loads. Where necessary, additional support or an alternative foundation solution may be required.
The tower’s height, exposure and connections to neighbouring scaffold structures determine the required stability measures. When additional structural calculations are needed, our scaffold design and engineering service can determine the appropriate ties, anchors, bracing, and support requirements for the staircase.
On occupied or restricted sites, the position must also account for pedestrian routes, vehicle movements, deliveries and other construction activities.
Mays Scaffolding establishes the proposed access layout before installation, including the required entry points, working levels and structural support.
The cost of hiring a HAKI staircase depends on the structure size, the number of levels required, and the conditions at the installation site.
A straightforward staircase serving a small number of levels will require different materials and labour than a taller tower serving multiple floors in a commercial development.
Factors affecting the quotation include:
Additional design or support requirements may also affect the cost.
We provide individual quotations based on the staircase required rather than a fixed price that may not reflect the actual project.
HAKI stair systems can be used internally where there is sufficient space, suitable support and a safe route between levels.
We assess available headroom, floor openings, and supporting surfaces before selecting the staircase configuration. Internal access may also be affected by existing structural elements and ongoing building work.
HAKI stair towers incorporate anti-slip stair surfaces designed to provide grip during normal outdoor use.
However, rain, mud, ice and other contaminants can still create slipping hazards. The staircase must be maintained in suitable condition, with appropriate precautions in place when adverse weather affects safe access.
HAKI stair towers can be constructed as independent structures, but this does not mean every staircase can be installed without ties, anchors or additional support.
Required stability measures depend on the tower’s height, loading, exposure, and structural design. A freestanding configuration must suit the specific installation.
Damaged stair treads, handrails, landings or structural components should be reported promptly.
Any part of the staircase affected by damage that could compromise safety must be taken out of use until it has been assessed. Repairs or replacement components may be required before access can resume, and costs will be incurred.
HAKI stair towers must be inspected in accordance with the applicable work-at-height requirements.
Where the statutory seven-day inspection regime applies, a competent person must inspect the structure at the required intervals and following circumstances that could affect its safety.
The inspection requirements depend on how the staircase is installed and used.
This depends on whether the staircase is structurally independent or relies on connections to the surrounding scaffold.
Removing adjacent scaffolding may affect the stair tower’s stability, even when the staircase itself remains intact. We establish the dismantling sequence and identify any temporary support required before removing structural components or connections.
If your construction project needs a temporary staircase between working levels, Mays Scaffolding can assess your access requirements and set up a suitable HAKI stair tower configuration.
We provide staircase installation and hire for construction contractors, commercial developments and refurbishment projects throughout London and the South East.
Call 020 3951 6014 to discuss your project or send us the site details for a free quotation.