From new housing developments to extensions and major property renovations, construction projects need scaffolding to provide access at different stages of building work. Mays Scaffolding works with builders, developers and construction contractors across London and the South East, installing scaffolds for bricklaying, roofing and other trades. Below, you’ll find photographs, installation details, and actual costs from completed construction projects, so you can see the work we’ve undertaken. Call 020 3951 6014 to request a free quotation for your building project.
Access for a construction project must be planned around how the building will be built.
Required working heights, construction methods, site conditions, and intended use can all affect the final arrangement. A brick-built extension, timber-frame house, and multi-plot development, for example, can each present very different requirements.
Mays Scaffolding works with builders, developers, contractors, and property owners on projects ranging from individual extensions and new-build houses to larger residential developments.
Before installation, we can discuss the build programme, required working levels, material loading, and any specific access requirements.
We erect scaffolding for new-build houses and other residential construction projects, including traditional masonry and timber-frame builds.
We can install working platforms for the main construction work, with later stages considered when the initial structure is planned.
Each installation is based on the building’s dimensions and design, along with the construction method used. We can also consider requirements known later in the build from the outset.
If further scaffold work is required during construction, we can arrange additional visits as part of the programme.
Extensions create different access considerations because new construction is taking place alongside an existing building.
We work on single-storey and multi-storey extensions, including projects involving brickwork, blockwork, structural work and roof construction. Where the build reaches roof level, working platforms for roofing scaffolding can provide access for the next stage of the project.
The position of existing walls, roofs and openings can affect where standards can be placed and how working platforms are formed. Conservatories, narrow side passages, neighbouring boundaries, and adjoining structures may also need consideration.
For two-storey extensions, our teams can plan working levels with the proposed floor, eaves, and roof heights in mind before construction reaches those points.
Bricklayers need the working platform to remain at a practical height in relation to the masonry being built.
On projects involving progressive brickwork or blockwork, we will add further lifts as construction reaches higher levels. This allows bricklayers to continue working from an appropriate platform rather than working increasingly far above the existing lift.
The number and position of these levels will depend on the building and the work being undertaken.
If bricks, blocks, or other masonry materials will be placed on the working platform, we also need to know this when discussing the installation so we can consider the intended loading.
Timber-frame construction presents different requirements from traditional brick and block construction, particularly because significant sections of the building can be assembled relatively quickly.
We work on timber-frame houses and extensions, planning the structure around the proposed dimensions and frame levels.
Where installation takes place before the complete frame is in position, we can work from construction drawings or dimensions supplied by the contractor to establish the required heights.
We can also consider any known external envelope requirements at this stage, helping avoid unnecessary changes later in the project.
Each lift’s position determines the height at which a working platform is available.
On construction projects, these levels must match the actual building dimensions. Floor levels, eaves, parapets, and roof lines can therefore influence where platforms are required.
Planning the heights is particularly useful on new builds and extensions where parts of the building do not yet physically exist when the initial structure is erected.
Where drawings or reliable dimensions are available, these can help us establish the proposed working levels before installation.
Building work does not always remain exactly as originally planned, and an existing structure sometimes needs to be altered.
We can return to carry out agreed adaptations, including adding further lifts, extending a section, or changing a platform where the construction itself has changed.
An alteration may also be required where a newly completed part of the building affects the original arrangement, or another phase of work introduces a different access requirement.
If changes are expected from the outset, we can discuss them when quoting the initial work.
Construction scaffolds may need to accommodate more than people and tools.
If bricks, blocks, or other building materials will be placed on a working platform, we need to know before installation. The intended loading is an important part of determining the appropriate arrangement.
This is particularly relevant to brickwork and blockwork where materials may need to be available close to the working area.
Requirements can vary considerably between a small extension and a larger construction project, so material loading should form part of our initial discussion.
We undertake scaffold work for residential developments and projects involving multiple new-build properties.
Individual plots may reach the relevant stages at different times, so we will coordinate installations and subsequent visits with the construction programme for each property.
Where a building needs weather protection during construction, we can also provide temporary roof scaffolding to cover the property while the relevant work is carried out.
For developers and contractors, we can discuss the number of plots, proposed sequence and anticipated requirements before work begins.
This gives us a clearer understanding of the programme and the likely visits required across the development.
Space on an active construction site often has to be shared between scaffold structures, building materials, plant, deliveries and vehicles.
These practical site conditions can influence how and when installation takes place.
Where relevant, we can discuss vehicle routes, delivery areas, material storage, site access and other ongoing operations with the builder or site manager beforehand.
This is particularly important on busy developments where our work needs to be coordinated with other contractors and scheduled site activity.
On projects where contractors regularly need to move between levels, dedicated tube-and-fitting scaffold stairs can provide access between levels as part of the overall scaffold arrangement.
The cost of construction scaffolding depends on the project’s size and requirements, as well as how long the structure will be needed.
A smaller extension may have a relatively short hire period, while a new-build house or housing development can require scaffolding for considerably longer.
Other factors that can affect the quotation include:
Our quotation will set out what is included and the agreed hire period. If the building programme runs longer than expected, we can arrange additional hire. We can also quote any further lifts, alterations, or additions required during construction based on the work involved.
Send us details of the proposed building work and, where available, drawings, dimensions, or site photographs, and we can prepare a quotation based on your exact project requirements.
Yes. If a builder, contractor, or site manager is running the project, we can discuss the scaffold requirements with them directly. This can help confirm dimensions, access points, construction stages, and when our team will need to attend the site.
Yes. Where a loading bay is required, we will discuss this before installation so we can consider its position, intended use, and loading requirements as part of the scaffold arrangement.
Yes. A scaffold staircase can be incorporated where it suits the site and project. This can be particularly useful in construction work where contractors need regular access between different levels.
Yes, but we need to establish this beforehand. If a hoist or other mechanical handling equipment is intended to work with the scaffold, let us know during the planning stage so we can properly consider the requirements.
Yes. We can include debris netting or sheeting where required for the project. Discuss this with us beforehand, as adding either can change the scaffold’s wind loading and may affect how the structure needs to be designed or secured. Do not add netting or sheeting to an existing scaffold without checking with us first.
Yes, a construction scaffold should be inspected before first use and then at least every seven days while it remains in use. It should also be inspected following circumstances that could affect it, including substantial alterations or adverse weather conditions. A competent person must carry out inspections.
No. A scaffold can be erected to a recognised standard configuration where appropriate. Structures falling outside recognised standard configurations require a design by calculation from a competent person. The requirements depend on the proposed arrangement and how the scaffold will be used.
Yes. This is common with new builds and extensions. We can establish proposed eaves, roof, and other relevant levels from drawings and dimensions before those parts of the building physically exist.
The scaffold needs a suitable foundation that can support it and the loads it carries. Soft ground, excavations, drains, basements, and other ground conditions can therefore be relevant when assessing where the structure will stand.
You should arrange dismantling once the work requiring scaffold access is complete. On a construction project, check with the relevant contractors first so the structure isn’t removed while another trade still needs it.
Whether you are building an extension, a new home or working across a larger residential development, tell us what is being constructed and when you need the scaffold.
Send us your plans, drawings, dimensions, or site photographs where available, and we can discuss your construction scaffolding requirements and prepare a quotation.