Our team erected a cantilevered scaffold at a two-storey property on Station Approach in East Horsley, Leatherhead, to provide access to the solar panels on the main roof. At the rear of the property, single-storey sections extend on either side of the garden fence, with the clients requesting that no scaffold load be imposed on either tiled roof. To accommodate this, a scaffold tower was erected in the gap between the two sections, with beams projecting outwards at the top lift to support the working platform above both lower roofs. This arrangement transferred the load through the central tower to ground level without loading either roof.
The scaffold tower was erected with a 3-metre-long base within the gap between the two single-storey roofs. Three pairs of standards were positioned along its length to form the tower’s supporting structure. The first lift was constructed at approximately 2.4 metres above ground level and was four boards wide. Diagonal sway bracing was installed across the tower face to provide lateral stability.
The second lift was erected approximately 2.4 metres above the first, bringing the working platform to 4.8 metres. Where existing roof structures restrict the positioning of upright tubes, cantilever scaffolding provides an alternative access solution using projecting lattice beams supported by the main tower.
For this installation, two 6-metre-long, 450mm-deep lattice beams formed the inside and outside ledgers in place of conventional scaffold tubes. Both beams extended approximately 1.5 metres beyond the end standards at either end of the tower, allowing the boarded platform to project over the two single-storey sections.
This arrangement provided sufficient access along the solar panels from a tower base measuring just 3 metres in length. As shown in the photographs, the lattice beams span the full length of the second lift, extending towards the dormer windows on either side.
Ledger bracing was installed adjacent to both end pairs of standards, running diagonally from the inside ledger to the bottom chord of the outside lattice beam. The braces were formed using 10ft scaffold tubes secured with double couplers.
To support the 1.5-metre cantilevered sections at either end of the tower, structural transoms were installed beneath the beams. Each transom comprised a 5ft scaffold tube secured to the standards using two double couplers, positioned tight against the underside of the double couplers supporting the beams.
The cantilevered sections were further strengthened with plan bracing, using 10ft scaffold tubes arranged diagonally between the inside and outside beams and secured to their bottom chords with swivel couplers. This helped maintain the rigidity and alignment of the projecting sections.
Raker ties were fitted at both ends of the scaffold using 21ft tubes to provide extra stability. Each raker was secured to the handrails on the top lift using double couplers, with its base resting on a sole board at patio level to distribute the load. As shown in the photographs taken from the rear of the property, the rakers extend diagonally outwards from the upper lift to the patio, helping restrain scaffold movement.
The upper working platform extended along the eaves, providing direct access to the solar panels on the main roof. Double guardrails and toe boards were installed along the outside edge of the platform, with stop-end guardrails fitted at both ends of the cantilevered sections. A ladder access gate was installed at the entrance to the top lift to protect the opening when not in use. The photograph taken from the upper platform shows how close the boarded area was to the solar panels.
The scaffold was hired for four weeks at £600.
This cantilevered installation is another example of the access solutions available through our scaffolding services across Surrey, with working platforms configured to accommodate existing buildings, restricted ground space and roof obstructions.
Location: Station Approach, East Horsley, Leatherhead, Surrey, KT24
Property: Two-storey house
Project: Cantilever scaffold for solar panel access
Dimensions: 3-metre-long base x 4.8 metres high, cantilevered approx. 1.5 metres at each end of the top lift
Lifts: 2 (first lift at 2.4m, second lift at 4.8m)
Platform Width: 4 boards
Hire Period: 4 weeks
Cost: £600
A different application of cantilevered beams is our freestanding cantilever scaffold on South Street, Chichester, where raker tubes and a buttress structure supported a weather protection installation.