Tailored to your property.
Scaffold hire periods to suit your project.
London, Surrey, Sussex, Hampshire, Berkshire & Kent.
Provided where required.
Mays Scaffolding provided roof access for a solar panel installation at Easton Lane on the Winnall Trading Estate in Winchester. The two-storey commercial building had a flat roof, and the installers needed safe access and edge protection while working on it. We supplied two pieces of scaffold: a tube-and-fitting access tower to reach the roof, and 50 linear metres of A-frame handrail at roof level.
For this access tower, our Winchester scaffolding installers built a 3.9-metre-long lower scaffold section, raised to about 2.1 metres high. Building the base out to this width made the tower more stable at ground level before it narrowed to its working size higher up.
From there, the tower stepped in to 2.4 metres in length, rising to around 7 metres at the third and final lift, which gave access to the roof. We built the platform six boards deep, giving installers a usable working area at the top to get on and off the roof.
The standards were the upright tubes that carried the tower’s load down to the ground, so their lengths shaped the rest of the build.
The base-out section used four 13ft tubes as base-lift ledgers and handrails. At just under 4 metres long, the 13ft tubes suited the width of the base.
For the uprights, we extended two 21ft tubes with 10ft tubes and joined four 16ft tubes end to end. Combining tubes this way gave us standards long enough to reach the top lift and carry its guardrails.
Where the tower stepped in, we used eleven 8ft tubes for ledgers, ledger bracing and the single handrail on the non-working lift. The 8ft length matched the tower’s 2.4 metre run so that we could use the same tube for each job. The ledger bracing ran diagonally through the tower’s depth between the front and back standards, stiffening the frame from front to back.
The non-working lift only needed a single handrail because nobody worked from it. It formed part of the structure on the way up to the roof rather than a platform in its own right.
Six 10ft tubes went into the sway bracing and the handrails on the top lift. The sway bracing ran diagonally up the face of the tower and stopped it from moving along its length, which became more important as the tower gained height.
Approximately nineteen 5ft tubes made up the tower’s smaller components. Some served as transoms, sitting under the boards and supporting them across the platform depth. Others formed stop end guardrails, closing off the ends of the lift so there were no open sides.
We fitted a ladder halo around the ladder opening. This guardrail allowed the installers to climb up and step onto the platform without an unprotected edge beside them. The remaining 5ft tubes were used as toe board droppers, giving the toe boards a fixing point between standards so tools and materials could not be kicked off the deck edge.
On the roof, we built 50 linear metres of A-frame handrail along the front edge and around the corner to the end of the building, giving the installers safe access while they fitted the panels.
Each A-frame was made from 5ft tubes set at an angle, so every tube worked as both a standard and a brace. We fixed the handrail to the standards with double couplers, which held the tubes at right angles and kept the rail square to each frame. We attached the back standard at the top with a swivel coupler, allowing us to set it at the angle needed to form the A shape. A 5ft tube then tied the standards together about 300mm above the roofline, locking each frame in position.
For properties occupied by businesses, we provide scaffolding for commercial premises, helping your business remain operational while work is carried out.
The scaffold was supplied at £1,800 for one week’s hire.
If you need roof access for a solar panel installation in Winchester or the surrounding area, contact Mays Scaffolding to discuss your project needs.
Another Winchester project involved providing scaffold for a flue installation on Alresford Road, giving installers safe roof access.