Gosport Borough Council required weather protection over the fountain in Falkland Gardens while its resin floor was being replaced. To keep the basin dry during the work, we installed a temporary roof scaffold with sheeting covering the entire fountain.
The scaffold measured approximately 10 metres along each of its four sides, with a depth of 1 metre, and was erected on the surrounding block paving. All standards were positioned outside the basin, keeping the fountain floor completely clear and accessible beneath the temporary roof.
Because the scaffold was only needed to support the temporary roof, there was no need for working platforms, double handrails, or toe boards. No scaffold boards were used, so board-bearing transoms were also unnecessary. The structure was assembled using load-bearing fittings throughout, including double couplers, swivel couplers and sleeve couplers, as the ledgers needed to support the beams and roof above.
A foot tie was installed around the entire perimeter, approximately 300 mm above the block paving, with a second lift set at approximately 2.1 metres high. Ledger bracing was fitted between each pair of standards across the 1-metre scaffold depth, while double sway bracing was installed along the inner and outer ledgers where required to provide additional stability.
The temporary roof was constructed with a fall from one side to the other, allowing rainwater to drain off the sheeting rather than collect on top. On the lower side, the beams were secured to the ledger at the 2.1-metre lift using double couplers. On the opposite side, an additional ledger was installed approximately 500 mm above the main lift ledger, with the beams fixed to it using double couplers.
This created a sloping roof, approximately 2.8 metres high at its lowest point and rising to 3.3 metres at the highest.
Eight rows of 450 mm lattice beams were installed across the scaffold, with each row made up of an 8-metre beam connected to a 4-metre beam. The beams were joined using two beam spigots, secured with eight spring clips per connection. The beam ends extended beyond the scaffold frame, as shown in the photographs, while an image taken before the roof sheeting was installed shows the full arrangement of beams spanning the fountain basin.
To provide stability and prevent sideways movement, the beams were plan-braced in pairs along their top chords using 8ft scaffold tubes, secured with swivel couplers at 2-metre intervals along their length.
Purlin tubes were installed across the top of the lattice beams at approximately 950 mm centres to support the roof sheeting. These were secured using putlog couplers, the only fittings of this type used on the entire scaffold.
Approximately 76 corrugated iron sheets, each measuring 8ft in length, were then laid over the purlins and secured using around 82 roofing couplers. Photographs taken from inside the scaffold show the sheets spanning the fountain basin, supported by the purlins above.
To enclose the structure and provide additional weather protection, we fitted plastic scaffold sheeting to all elevations. We installed fixing tubes approximately 1 metre above the foot tie to support the protective sheeting.
The lower elevation and both side elevations were covered with 2-metre sheeting, while the highest elevation required 3-metre sheets to accommodate the increased roof height. Bungee cords secured the scaffold sheeting at 300 mm horizontal intervals and 1-metre vertical intervals, keeping the covering in place along the full length of each elevation beneath the roofline.
As the freestanding scaffold was not tied to any surrounding structures, kentledge was used to provide stability against the strong winds coming off the nearby water. Four 1,000-litre IBC containers were positioned on the foot tie to provide additional weight and help prevent uplift. One of these containers is visible in the corner of the scaffold in the interior photographs.
The scaffold was hired for four weeks at a cost of £4,090. This temporary roof installation is one example of the scaffolding projects we undertake in Gosport and across Hampshire for a range of access and weather protection requirements.
Location: Gosport Fountain, Falkland Gardens, Gosport, PO12 1EP
Client: Gosport Borough Council
Project: Freestanding temporary roof over a fountain during resin floor replacement
Dimensions: 10m x 10m x 10m x 10m, 1m deep
Roof Height: 2.8m at the lowest point, approx. 3.3m at the highest
Lifts: Foot tie at approx. 300mm, lift at approx. 2.1m
Beams: 8 rows of 450mm beams (8m + 4m per row)
Roof Sheets: Approx. 76 x 8ft CI sheets
Side Sheeting: Plastic sheeting to all four elevations
Kentledge: 4 x 1000-litre IBC containers
Hire Period: 4 weeks
Cost: £4,090